BIM COMPETENCY REQUIREMENTS FOR CHINA RAILWAY INFRASTRUCTURE PROJECT

Authors

  • Dahuai Zhao 5School of Housing Building and Planning, UNIVERSITI SAINS MALAYSIA
  • Nurul Sakina Mokhtar Azizi 5School of Housing Building and Planning, UNIVERSITI SAINS MALAYSIA
  • Nazirah Zainul Abidin 5School of Housing Building and Planning, UNIVERSITI SAINS MALAYSIA
  • Weiwei Wang School of Civil Engineering, DEYANG COLLEGE OF URBAN RAIL TRANSIT, CHINA
  • Jiasheng Zhou School of Housing Building and Planning, UNIVERSITI SAINS MALAYSIA

DOI:

https://doi.org/10.21837/pm.v24i44.2255

Keywords:

railway infrastructure, BIM, competency requirements, thematic analysis, delivery governance

Abstract

BIM delivery in railway infrastructure is shaped by dense subsystem interfaces and formal review-and-acceptance gates, which place strong demands on traceable, auditable information. However, BIM competency descriptions in the literature remain largely generic and provide limited guidance for railway-specific delivery governance and role profiling. This study investigates the BIM competencies required for railway infrastructure projects through a qualitative design using a structured interview protocol with open-ended prompts. Ten railway BIM practitioners were interviewed, and transcripts were analysed thematically; themes were developed inductively and reported using Succar’s Core-Domain-Execution layers. The findings indicate that competency is primarily judged by the ability to produce review-ready packages under controlled coordination and change, rather than by software proficiency alone. Five competency clusters were identified: data governance and traceability; integration and platform-enabled coordination; compliance and configuration discipline; model and workflow execution for deliverable production; and lifecycle readiness supported by scenario thinking and reality-capture/verification. The study proposes a preliminary railway-contextualised competency structure and links clusters to delivery nodes and verifiable artefacts to support assessment and training design.

Downloads

Download data is not yet available.

References

Bartoněk, D., Bureš, J., Vystavel, O., & Havlíček, R. (2023). Case study of remodelling the as-built documentation of a railway construction into the BIM and GIS environment. Applied Sciences, 13(9), 5591. https://doi.org/10.3390/app13095591

Großauer, K., Huis, M., Jedlitschka, G., Matt, R., Mulitzer, G., & Zwittnig, G. (2022). New built and refurbished railway tunnels: Data delivery from BIM models to ÖBB’s asset management. Geomechanics and Tunnelling, 15(2), 190-200. https://doi.org/10.1002/geot.202100071

Haron, R. C., & Muhd Zafir, N. B. (2025). Digital twin application in construction cost management. Planning Malaysia, 23(1), 81-96. https://doi.org/10.21837/pm.v23i35.1665

Hussain, O. A. I., Moehler, R., Walsh, S. D. C., & Ahiaga-Dagbui, D. (2024). Minimizing cost overrun in rail projects through 5D-BIM: A conceptual governance framework. Buildings, 14(2), 478. https://doi.org/10.3390/buildings14020478

Laishram, B., & Sood, R. (2024). Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), 1-20. https://doi.org/10.5130/ajceb.v24i3.8738

Lee, H., Moon, H., & Lee, J. (2023). Establishing a customized framework of BIM education programs for owners in South Korea. WIT Transactions on Ecology and the Environment, 261, 293-303. https://doi.org/10.2495/ESUS230251

Mahazir, M., Rahman, R. A., Mohd Zainudin, N., & Salleh, S. (2024). Construction project failure: Investigating causes of ineffective building information modelling execution plans. Planning Malaysia, 22(3), 47-62. https://doi.org/10.21837/pm.v22i32.1492

Shi, X., & Guo, Y. (2025). Research on digital delivery of high-speed railway station projects based on BIM. Advances in Engineering Technology Research, 13(1), 289-296. https://doi.org/10.56028/aetr.13.1.289.2025

Succar, B. (2010). Building information modelling maturity matrix. In J. Underwood & U. Isikdag (Eds.), Handbook of research on building information modeling and construction informatics: Concepts and technologies (pp. 65-103). IGI Global. https://doi.org/10.4018/978-1-60566-928-1.ch004

Succar, B., Sher, W., & Williams, A. (2013). An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction, 35, 174-189. https://doi.org/10.1016/j.autcon.2013.05.016

Tajuddin, M. A., Mohamed, M. R., Rashid, M. N. A., Nasir, N., & Mahdzir, M. (2025). Barriers and solutions of building information modelling (BIM) in construction site safety in Malaysia. Planning Malaysia, 23(2), 480-494. https://doi.org/10.21837/pm.v23i36.1733

Downloads

Published

2026-10-07

How to Cite

Zhao, D., Mokhtar Azizi, N. S., Zainul Abidin, N., Wang, W., & Zhou, J. (2026). BIM COMPETENCY REQUIREMENTS FOR CHINA RAILWAY INFRASTRUCTURE PROJECT. PLANNING MALAYSIA, 24(44). https://doi.org/10.21837/pm.v24i44.2255