TOWARDS SUSTAINABLE PRIVATE FINANCE INITIATIVE (PFI) PROJECT DELIVERY: STRATEGIES FOR MITIGATING INCOMPLETE CONTRACT IMPLICATIONS
DOI:
https://doi.org/10.21837/pm.v24i44.2254Keywords:
incomplete contract, Private Finance Initiative, strategy, concession contractAbstract
Incomplete contract (IC) is defined as a contract that fails to clearly spell out ex-ante the parties’ requirements, duties and obligations for every realised contingency and it has gaps, missing provisions, and ambiguities in its terms. Past studies have found that PFI contracts in Malaysia are incomplete and consequently caused positive and negative implications. Addressing these implications is crucial to achieving not only project efficiency but also long-term sustainability in PFI project delivery. The methodology adopted combines an intensive review of literature on IC and PFI, and two (2) rounds of Modified Delphi. A total of 55 strategies were identified for the 12 clauses deemed incomplete in PFI contracts. Some of the strategies are to ensure that both public and private representatives involved are technically knowledgeable, to develop a complete database on the service level and standard for the purpose of determining the KPI, and to provide a clear statement of needs. By mitigating the implications of incomplete contracts, these strategies contribute towards more transparent governance, efficient resource utilisation, and sustainable outcomes in future PFI projects. The findings of this research can serve as a reference for key PFI stakeholders, policy makers and contract drafters in their future endeavour in developing and managing PFI contracts that support sustainable project delivery.
Downloads
References
Abdallah, A. A.-N., Darayseh, M., & Waples, E. (2013). Incomplete Contract, Agency Theory and Ethical Performance: A synthesis of the factors affecting owners’ and contractors’ performance in the bidding construction process. Journal of General Management, 38(4), 39–57.
Abdullah Habib, S. N. H., Ismail, S., & Syed Kuzzan, S. M. (2020). Risk Factors Towards Public-Private Partnerships (PPP) Projects Implementing Building Information Modelling (BIM) in the United Kingdom (UK): A Lesson Learnt for Malaysia. Planning Malaysia, 18(4), 340–351.
Bajari, P., Tadelis, S., & Houghton, S. (2014). Bidding for Incomplete Contracts : An Empirical Analysis of Adaptation Costs. The American Economic Review, 104(4), 1288–1319. http://faculty.washington.edu/bajari/iosp10/bidding_incomplete_3-2010.pdf
Bennett, J., & Iossa, E. (n.d.). Public-Private Partnerships; an Incomplete Contract Approach. www.esrc.ac.uk/my-esrc/.../cd6820f9-cda8-4035-b4de-ed713ce35d67?
Cruz, C. O., & Marques, R. C. (2013). Flexible contracts to cope with uncertainty in public–private partnerships. International Journal of Project Management, 31(3), 473–483. https://doi.org/10.1016/j.ijproman.2012.09.006
Demirel, H. Ç., Leendertse, W., Volker, L., & Hertogh, M. (2017). Flexibility in PPP contracts – Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), 196–206. https://doi.org/10.1080/01446193.2016.1241414
Dolla, T., & Laishram, B. (2020). Factors affecting public-private partnership preference in Indian municipal waste sector. International Journal of Construction Management, 20(6), 567–584. https://doi.org/10.1080/15623599.2019.1703085
Domingues, S., & Sarmento, J. M. (2016). Critical renegotiation triggers of European transport concessions. Transport Policy, 48(April), 82–91. https://doi.org/10.1016/j.tranpol.2016.02.016
Domingues, S., & Zlatkovic, D. (2015). Renegotiating PPP Contracts : Reinforcing the ‘ P ’ in Partnership Renegotiating PPP Contracts : Reinforcing the ‘ P ’ in Partnership. Transport Reviews, 35(2), 204–225. https://doi.org/10.1080/01441647.2014.992495
Garvin, M. J. (2009). Governance of PPP Projects Through Contract Provisions. Conference of Leadership and Management of Construction. http://www.academiceventplanner.com/LEAD2009/papers/Garvin.pdf
Grant, S., Kline, J. J., & Quiggin, J. (2012). Differential awareness, ambiguity, and incomplete contracts: A model of contractual disputes. Journal of Economic Behavior & Organization, 82(2–3), 494–504. https://doi.org/10.1016/j.jebo.2012.02.021
Hamimah, A., & Morledge, R. (2003). Application of Delphi Method on Critical Success Factors In Joint Venture Projects In Malaysian Construction Industry. In C. O. Egbu & M. K. L. Tong (Eds.), Proceedings of The First Scottish Conference for Postgraduate Researchers of The Built And Natural Environment 18-19 November 2003 - Glasgow Caledonian University, Glasgow, United Kingdom (Issue November, pp. 41–51). Glasgow Caledonian University.
Iossa, E., Spagnolo, G., & Vellez, M. (2007). Best Practices on Contract Design in Public-Private Partnerships. http://ppp.worldbank.org/
Jin, H., Liu, S., Li, J., & Liu, C. (2020). A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), 642–652. https://doi.org/10.1080/15623599.2020.1738003
Jin, X., & Doloi, H. (2008). Interpreting risk allocation mechanism in public–private partnership projects: an empirical study in a transaction cost economics perspective. Construction Management and Economics, 26(7), 707–721. https://doi.org/10.1080/01446190801998682
Keenan, J., & Mccabe, B. (2010). Contracting Problems? Tales from PFI Schools. Journal of Finance and Management in Public Services, 9(1), 17–29.
Mat Aron, N. W., Mohd Rahim, F. A., & Aziz, N. M. (2024). Analyzing the Issue of E-Tendering Implementation in Public-Private Partnership Practice: A Preliminary Study in Malaysia. Planning Malaysia, 22(3), 181–195.
Miller, F., Denison, C. a., & Matuszewski, L. J. (2013). Modeling the Antecedents of Preferences for Incomplete Contracts in Bilateral Trade: An Experimental Investigation. Behavioral Research in Accounting, 25(1), 135–159. https://doi.org/10.2308/bria-50346
Mohd Fairullazi, A. (2014). Development of Life Cycle Cost Strategy and Protocol on Cost Data Input in Malaysia. International Islamic University Malaysia.
Muhammuddin, N. N., Mohd-Danuri, M. S., Hanid, M., Ismail, F., & Mohd Nawi, M. N. (2023). A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects. Planning Malaysia, 21(5), 267–282.
Muhwezi, L., Acai, J., & Otim, G. (2014). An Assessment of the Factors Causing Delays on Building Construction Projects in Uganda. Construction Engineering and Management, 3(1), 13–23. https://doi.org/10.5923/j.ijcem.20140301.02
Robert, O. K., Dansoh, A., & Kuragu, J. K. O. (2014). Reasons for adopting Public – Private Partnership ( PPP ) for construction projects in Ghana. International Journal of Construction Management, 14(4), 227–238. https://doi.org/10.1080/15623599.2014.967925
Robinson, H. S., & Scott, J. (2009). Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), 181–197. https://doi.org/10.1080/01446190802614163
Samer Shahedza, K., & Khairuddin, A. R. (2016). Quantity Surveyors and their competencies in the provision of PFI services. Malaysian Construction Research Journal (MCRJ), 18(1), 153–170.
Senanu, A., Kukah, K., John, D., Ameyaw, E. E., Senanu, A., Kukah, K., & Edwards, D. J. (2021). Fuzzy synthetic evaluation of moral hazard and adverse selection of public private partnership projects. International Journal of Construction Management, 0(0), 1–10. https://doi.org/10.1080/15623599.2021.2010356
Van Den Hurk, M., & Verhoest, K. (2016). The challenge of using standard contracts in public–private partnerships. Public Management Review, 18(2), 278–299. https://doi.org/10.1080/14719037.2014.984623
Downloads
Published
How to Cite
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 Unported License.
Copyright & Creative Commons Licence
eISSN: 0128-0945 © Year. The Authors. Published for Malaysian Institute of Planners. This is an open-access article under the CC BY-NC-ND license.
The authors hold the copyright without restrictions and also retain publishing rights without restrictions.